Wednesday, July 1, 2026
  • Home
  • Politics
  • News
  • Business
  • Culture
  • National
  • Sports
  • Lifestyle
  • Travel
  • Opinion
PeriscopeNGA.com
  • Home
  • News
  • Politics
  • Business
  • Culture
  • Opinion
  • Lifestyle
  • Contact
No Result
View All Result
PeriscopeNGA.com
Home Water, Sanitation and Hygiene

An Overview Of Rehabilitation, Expansion, Upgrade Of Gombe Regional Water Supply Project Flagged off By Gov. Inuwa Yahaya

Ademola by Ademola
January 8, 2023
in Water, Sanitation and Hygiene
0
An Overview Of Rehabilitation, Expansion, Upgrade Of Gombe Regional Water Supply Project Flagged off By Gov. Inuwa Yahaya
1k
VIEWS
Share on FacebookShare on Twitter

 

An Overview Of Rehabilitation, Expansion, Upgrade Of Gombe Regional Water Supply Project Flagged off By Gov. Inuwa Yahaya

Related posts

Suspected militia group kills two on Taraba/Benue border community

Taraba: I slashed sweepers’ salaries, not Gov Kefas — Agency chairman

June 24, 2026
1k
ADAC cluster hails Gov Yahaya over assent of Gombe disability bill, appointment of Dr Adamu as ES

News commentary: World Environment Day 2026 special, by Richard James

June 5, 2026
1k

 

On 6th of January, 2023, Governor Muhammadu Inuwa Yahaya, along side Hon. Minister of Water Resources, Engr.Sulaiman H. Adamu formally flagged off a multi-billion Naira water project in a bid to end the age-long water supply challenges in Gombe Metropolis and environs.

The project commenced with the signing of memorandum of understanding between Gombe State Government and the Federal Ministry of Water Resources in August 2021.

The physical implementation of the project commenced with the award of contract in May 2022 to Jidadu Ventures Nigeria Limited at the total contract sum of 11.492 billion naira and engineering consultancy services to Messrs Global Ecological Consultant, Nigeria Limited at the total contract of 419.2 million naira.

Under the arrangement, Gombe is funding 70 percent of the total financial cost of the contract, amounting to N8.045 billion while the Federal Government is contributing 30 percent which is N3.447 billion .

The works to be executed under the contract are categorized into three:

The first category: Construction of New Booster Stations

This include:
– Construction of three booster stations at Tumfure, NTA and Special Development Zone Communities
– Construction of 1000 cubic meter (1 million litre) capacity braithwaite surface tank
– Construction of 500 cubic meter (500,000 cubic litre capacity) elevated water tank on twelve meter towers
– Supply and installation of Hybrid solar powered pumps
-Construction of Ancillary works which include: admin block, generator house, pump house, security post and perimeter fence
-Construction of another elevated water tank of 500 cubic meter (500,000 cubic litre capacity) on twelve meter towers at Gombe International Conference Center, ICC along Bauchi Road.

 

The 2nd category; Tabra water scheme

This include:
-Construction of three solar-powered boreholes;
-Construction of 200 cubic meter (200,000 cubic litre capacity) braithwaite surface tank;
– construction of 100 cubic meter (100,000 cubic litre capacity) elevated water tank on twelve meter tower station
– Supply and installation of package treatment plants and
– Construction of ancillary buildings which include: admin block, pump house security post and perimeter fencing to safeguard the facility.

The 3rd category; Wuro Juli Water Scheme

The project involves:
– Conversion of 6 existing boreholes from generator based to solar-powered based
– Construction of additional 6 solar powered boreholes
– Supply and installation of package treatment plant
– Supply and installation of high leap pumps, rehabilitation of existing ancillary buildings
– Construction of perimeter fencing and security post to safeguard the investment
– Rehabilitation and replacement of the overhead tank at Women’s Center.
-Construction of 160 kilometre pipeline of between 75 to 200 millimetres in diameter of High Density Polyethylene, HDPE Pipes for distribution network.
– Replacement of valves and installation of meters.

The project is packaged to include a sustainability aspect where there will be technical support and capacity building for Gombe State Ministry of Water Resources and Gombe State Water Board to be able to operate and maintain these systems once they are completed.

Work has already reached significant level of completion at many sites of the project. In view of that, Governor Inuwa pledged to complete the project before the end of May, 2023.

Tags: ExpansionGombe Regional WaterGov InuwaProjectrehabilitationsupplyUpgradeYahaya
Previous Post

THE PRESUMPTION OF INNOCENCE IN NIGERIA’S CRIMINAL JUSTICE SYSTEM

Next Post

Chief Collins Iheonunkwu urges youths to shun criminal activities in Abia State 

Next Post
Chief Collins Iheonunkwu urges youths to shun criminal activities in Abia State 

Chief Collins Iheonunkwu urges youths to shun criminal activities in Abia State 

BROWSE BY CATEGORIES

  • Advertorial
  • Agriculture
  • Appointment
  • Business
  • Columns
  • Covid-19
  • Crime
  • Culture
  • Development
  • Education
  • Family Planning
  • Features
  • Finding Purpose with Oluwatimileyin
  • Health
  • Interview
  • Investigation
  • Keeping It Real With Nneka
  • Lifestyle
  • Malnutrition
  • National
  • News
  • News
  • NYSC
  • Opinion
  • Opinion/Letter
  • Pillow Talks With Keziah
  • Politics
  • Responsible Parenting with Oluwatobi Akintola
  • Sport
  • Sports
  • Technology
  • Travel
  • Water, Sanitation and Hygiene

BROWSE BY TOPICS

#Gombe 000 2022 2023 2027 Abia Abuja Adamawa Again Apc Bauchi by Austen Akhagbeme by Ben Ngwakwe by Citizen Bolaji O. Akinyemi By Douglas Ogbankwa by Erasmus Ikhide by Hassan Gimba by Tony Erha Campaign CBN Commissioner Edo 2024 ekiti state FG Gombe Gombe Gov Gombe State Gov Yahaya Group Inec insecurity Kaltungo Mailantarki nigeria NNPP North-East NYSC others Pdp Police Qatar Taraba Tinubu USAID women
  • About
  • Advertise
  • Careers
  • Contact

© 2023 PeriscopeNGA.com - Periscope Nigeria | Website by Sociopact.

No Result
View All Result
  • Home
  • Politics
  • News
  • Business
  • Culture
  • National
  • Sports
  • Lifestyle
  • Travel
  • Opinion

© 2023 PeriscopeNGA.com - Periscope Nigeria | Website by Sociopact.

Loading Comments...

    Jojobet GirişGrandpashabetgrandpashabetjojobetcasibom girişjojobetJojobetjojobetcasibomholiganbetjojobet girişcasibomJojobetbetciobetciojojobet resmi giriş